Boys’ Team farmstand: 70% complete
The boys (Team Genie) are moving along on their farmstand, now with all the ribs/bays in place, ready for floor decking, siding, and built-in counter top. This farmstand will be installed in front of Town Hall in Lewiston, on or around May 17th.
The counter structure (above) will support a 30″-deep surface for selling and displaying produce.
Siding was individually rip-cut and painted, then laid out in a randomized pattern. This will be the exterior “skin” of the farm stand that you will see from the outside.