Boys’ Team farmstand: 70% complete

May 7th, 2012

IMG_0555

The boys (Team Genie) are moving along on their farmstand, now with all the ribs/bays in place, ready for floor decking, siding, and built-in counter top. This farmstand will be installed in front of Town Hall in Lewiston, on or around May 17th.

IMG_0557

IMG_0559

The counter structure (above) will support a 30″-deep surface for selling and displaying produce.

IMG_0569

Siding was individually rip-cut and painted, then laid out in a randomized pattern. This will be the exterior “skin” of the farm stand that you will see from the outside.

About

Studio H is a public high school "design/build" curriculum that sparks rural community development through real-world, creative projects. By learning through a design sensibility, applied core subjects, and "dirt-under-your-fingernails" construction skills, students develop the creative capital, critical thinking, and citizenship necessary for their own success and for the future of their communities.

Categories

Search this site